The biogas plant is located in Preveza (Greece) and has an installed electrical capacity of 1 MW. Its innovative design and proven technology, developed entirely by Renovebio, make this plant one of the flagship examples of our solutions for the energy recovery of agricultural and livestock waste.
It feeds almost 8.5 million kilowatt-hours into the grid each year via cogeneration. The feed plan is designed to dose materials with different characteristics on a daily basis, using an automated feeding system capable of creating a homogeneous mix to be sent to the digesters. The primary digester prevents the formation of sludge thanks to a special bottom-removal system and sends the appropriately mixed and heated biomass to the secondary digester, completing the fermentation process for maximum biogas production.